WEST SYSTEM 105/206 (slow)
The figures Gougeon Brothers (WEST SYSTEM) prints for WEST SYSTEM 105/206 (slow) on its own specification sheet, at the conditions it names. Where the sheet doesn't give a figure, this page says so rather than borrow one from another product.
- Open time
- 90–110 min
- Total assembly time
- Not on the sheet we read
- Clamp time
- Not on the sheet we read
- Cure
- Not on the sheet we read
- Lowest temperature
- Not on the sheet we read
- Water resistance
- Moisture-resistant, by the maker
- VOC
- Not on the sheet we read
- Conditions
- 72 °F; pot life 20–25 minutes for 100 g in the cup, working time 90–110 minutes as a thin film
- Food contact
- The sheet we read makes no food-contact statement
One source: Gougeon Brothers (WEST SYSTEM), the maker of that product
From the sheet: 5 parts resin to 1 part hardener by volume with the maker’s pumps.
Related
- Every glue side by side: wood glue dry time chart
- Glue types and how they work: wood glue
- What Type I and Type II water resistance mean: Type I vs Type II glue
- Titebond Original, II and III together: Titebond comparison
- How much to mix: epoxy calculator
Work it out for your project
- Plan the finish for your project
Pick the piece and the wood, then get a dated coat schedule from the product’s own sheet.